Advanced Planning and Scheduling

What is APS?

APS (Advanced Planning and Scheduling) is a modern tool and approach that becomes indispensable for efficient production planning in the era of digital transformation and Industry 4.0. Thanks to integrated algorithms for multi-criteria optimization and a contemporary approach to scheduling problem-solving, this software allows for optimal operational production planning in a few steps, down to seconds, taking into account available resources, existing constraints, and specified priorities. APS analyzes data and responds to changes in real-time to construct an optimal plan, considering current capabilities, needs, and the state of production.

How does APS decrease costs in operations and increase profit? Key benefits of using APS:

  • Improve the customer service level – deliver orders on time due to the operative control of MAD (manufacturing agreed dates).
  • Increase the throughput of the enterprise - due to the optimization planning of the load on work centers, changeovers optimization, and machines utilization optimization considering alternative machines
  • Reduce the level of unclaimed work in progress -  due to the operational control of unclaimed WIP.

Results achieved by our Clients:

  • Increase in the number of orders scheduled at the time desired by the customer up to 98%
  • Increasing production throughput up to 19%
  • Decreased average order operations cycle up to 6%
  • Reducing machine changeover time up to 21%
  • Increase bottleneck utilization up to 13%

What are APS key functions?

Planning and Scheduling:

  • Work centers load balancing (assigning works to alternative work centers)
  • Continuous works sequences planning
  • Restricting work centers quantity for parallel work/order execution
  • Early manufacturing “START DATE” restriction for SFG (e.g., waiting for cooling)
  • Work orders output confirmation on Gantt Chart
  • Freezing manufacturing sequence for work centers
  • Planning and daily control over orders delivery dates
  • Planning considering raw materials availability restriction
  • Cross-plant scheduling
  • Restrictions on drum sizes for work centers
  • KPIs for each schedule version
  • Sub-resources scheduling (work teams, etc.)
  • Modeling schedules for different work patterns (e.g., Friday is a day off)

Orders and SFGs’ aggregation:

  • Advanced aggregation mode, configuration of aggregation rules considering specifics for SFG groups, equipment, input & output limitations

Dispatching Work Orders, launching execution of Work Orders:

  • Production and work orders calculation for: shops, shifts, work centers
  • Calculating raw materials needs and transfer requests according to work orders
  • Shift-wise analysis for work centers utilization

Advanced Planning and Scheduling:

  • SFG batches scheduling for work centers (works assigning to work centers)
  • Different schedule versions calculation according to different optimization criteria and choosing the best one
  • Planner tools for work centers sequence management at Gantt Chart